Key Sections Highlighted:
Pre-Construction Protocols
Subgrade preparation & material QC testing (ASTM D6392/D6747 standards referenced)
Precision Laying Techniques
Directional deployment strategies for hydraulic optimization
Dual welding methods (hot wedge/extrusion) with 100mm overlap compliance
Anchoring Systems Engineering
Slope stabilization: 0.5m×0.3m trench anchoring at 5-10m intervals
Base securing: Ballast placement protocols
Protective Layer Specifications
Gradation-controlled soil/sand layers (min. 0.5m/0.3m thickness)
Geotextile interlayer requirements (≥200g/m²)
QA/QC Framework
Destructive/non-destructive seam testing (peel/shear, spark testing)
Final acceptance via hydrostatic testing & seepage monitoring
Technical Value Proposition:
This procedural guide synthesizes geosynthetic engineering best practices with tailings-specific compliance requirements, addressing critical failure points in containment systems through:
Particle size control for puncture prevention
Slope-stress-adapted installation geometries
Multi-layer defense against mechanical/UV degradation
(Note: Title and structure optimized for geotechnical engineers and EPC contractors in mining/environmental sectors. Includes measurable benchmarks for regulatory compliance.)
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA