WELCEOM TO TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD OFFICIAL WEBSITE
Language: 中文版 ∷  英文版

Company new

Comprehensive Construction Guidelines for Geomembrane Applications in Tailings Management: Anti-Seepage Implementation and Quality Assurance

Key Sections Highlighted:

  1. Pre-Construction Protocols

    • Subgrade preparation & material QC testing (ASTM D6392/D6747 standards referenced)

  2. Precision Laying Techniques

    • Directional deployment strategies for hydraulic optimization

    • Dual welding methods (hot wedge/extrusion) with 100mm overlap compliance

  3. Anchoring Systems Engineering

    • Slope stabilization: 0.5m×0.3m trench anchoring at 5-10m intervals

    • Base securing: Ballast placement protocols

  4. Protective Layer Specifications

    • Gradation-controlled soil/sand layers (min. 0.5m/0.3m thickness)

    • Geotextile interlayer requirements (≥200g/m²)

  5. QA/QC Framework

    • Destructive/non-destructive seam testing (peel/shear, spark testing)

    • Final acceptance via hydrostatic testing & seepage monitoring

Technical Value Proposition:
This procedural guide synthesizes geosynthetic engineering best practices with tailings-specific compliance requirements, addressing critical failure points in containment systems through:

  • Particle size control for puncture prevention

  • Slope-stress-adapted installation geometries

  • Multi-layer defense against mechanical/UV degradation

(Note: Title and structure optimized for geotechnical engineers and EPC contractors in mining/environmental sectors. Includes measurable benchmarks for regulatory compliance.)



CONTACT US

COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD

Contact:Nickle Nie

Tel:008615866038408

Phone:008615866038408

Email:nickle@rhgeos.com

Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA