Construction Process and Key Technical Points of Drainage Board Installation

1. Construction Preparation

  • Material Inspection: Verify drainage board specifications (drainage capacity, compressive strength, durability) and prepare ancillary materials (e.g., geotextiles).

  • Equipment Setup: Deploy bulldozers, excavators, and specialized drainage board insertion machines.

  • Site Clearing: Remove vegetation/debris; grade the site to ensure a minimum 2% slope for drainage.

2. Survey & Marking

  • Use total stations or theodolites to mark installation lines and spacing points with stakes/lime.

3. Drainage Board Installation

Installation Methods:

  • Vertical Insertion (for soft ground improvement):

    • Penetrate soft soil layers to reach firm strata using depth-controlled insertion machines.

  • Horizontal Laying (for roofs/underground garages):

    • Secure boards to substrates with cement nails or plastic anchors.

Key Controls:

  • Insertion Depth: Must meet design requirements (typically penetrating soft soil into stable layers).

  • Connections:

    • Overlap (≥200mm) with adhesive or welding (leak-proof seams verified by testing).

    • Anchor vertical boards at tops to prevent pull-out.

4. Geotextile Covering

  • Lay geotextiles (≥100mm overlaps) over boards to filter debris and protect drainage channels. Ensure wrinkle-free placement with stitched/bonded seams.

5. Backfilling & Finishing

  • Backfill: Use clean soil in ≤300mm compacted layers to avoid damage.

  • Surface Treatment: Grade and compact for final topography; add landscaping if required.

6. Quality Assurance

  • Material QC: Test drainage boards (permeability, strength) and geotextiles (tensile, permeability) per batch.

  • Process Control: Monitor spacing, insertion depth, and seam integrity. Ensure machine operation maintains verticality.

  • Post-Installation Tests:

    • Sample inspections for installation quality.

    • Assess effectiveness via settlement monitoring and pore water pressure measurements.


Title"Drainage Board Installation: Procedures, Technical Standards, and Quality Control Measures"

Core Requirements:
✔ Precision Placement – Vertical/horizontal alignment per design.
✔ Robust Connections – Welded/overlapped seams to ensure continuity.
✔ Layered Protection – Geotextile + backfill for system longevity.
✔ Performance Validation – Testing pre- and post-construction.

Applications: Soft ground consolidation, rooftop drainage, underground waterproofing.


CONTACT US

COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD

Contact:Nickle Nie

Tel:008615866038408

Phone:008615866038408

Email:nickle@rhgeos.com

Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA