(Subtitle: Standardized Installation Procedures for Geocell Retaining Systems in Slope Stabilization Projects)
Key Construction Stages:
Pre-Construction Preparation
Material verification (ASTM D7864 compliance)
Subgrade preparation (95% compaction)
Survey marking (±5mm tolerance)
Geocell Deployment
Anchor trench configuration (300×500mm)
Node fixation (U-pins at 1m intervals)
Seam connection (thermal fusion welding)
Infill Placement
Graded aggregate (≤2/3 cell height)
Layered compaction (150-300mm lifts)
90% relative density requirement
Surface Protection
Geotextile overlay (200g/m² minimum)
Hydroseeding application
Bioengineering integration
Drainage System
Interceptor ditch (Q=5yr storm)
Weep holes (Φ50mm@2m grid)
Toe drain (1:100 gradient)
Quality Assurance Measures:
In-situ CBR testing (≥15%)
Pullout resistance test (≥1.2kN)
Slope stability analysis (FoS≥1.5)
Engineering Benefits:
40% increase in shear strength
60% reduction in erosion potential
25-year design service life
(Note: Complies with ISO 10318 and FHWA-NHI-00-043 standards for slope reinforcement applications.)
Alternative Title Options:
"Geocell Slope Stabilization: From Installation to Performance Verification"
"Mechanically Stabilized Earth Slopes Using Geocell Technology"
"Best Practices for Geocell-Reinforced Slope Construction"
Would you like to emphasize specific slope angles (e.g., 45° vs. 70°) or seismic considerations? I can refine the technical focus accordingly.
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA