Application of Drainage Boards in Tunnel Construction

1. Pre-Construction Preparation

  • Material Inspection:
    Verify drainage board specifications (thickness, permeability ≥10⁻² cm/s) and check for physical damage.

  • Tool Preparation:
    Prepare specialized laying equipment, cutting tools, and anchoring materials (e.g., HDPE fixing pins).

  • Subgrade Treatment:
    Achieve surface flatness (≤3mm/m² deviation) and remove protrusions (>2mm height).

2. Drainage Board Installation

  • Positioning & Layout:

    • Install along tunnel sidewalls and invert with 0.5-1% gradient toward collection points.

    • Maintain ≤5mm/m longitudinal wrinkling tolerance.

  • Connection Methods:

    • Overlap: Minimum 100mm overlap with seam sealing tape (peel strength ≥6N/cm).

    • Thermal Welding: For HDPE boards, use 180-220°C wedge welders at 0.8-1.2m/min speed.

  • Detail Processing:

    • At corners: Custom-cut boards with 150% increased fastener density.

    • At expansion joints: Allow 5-8% elongation capacity.

3. System Integration

  • French Drain Interface:

    • Embed board ends 300mm into drain trenches with bentonite waterstop.

  • Pipe Connections:

    • Install geotextile-wrapped intake headers (orifice size ≤5mm) at 15-20m intervals.

4. Protection & Backfilling

  • Protective Measures:

    • Cover with 400g/m² nonwoven geotextile before subsequent construction.

    • Prohibit equipment (>2kPa ground pressure) directly over boards.

  • Backfill Protocol:

    • Use well-graded aggregates (4-20mm) in 200mm compacted lifts (≥95% Proctor).

5. Quality Assurance

  • Visual Inspection:

    • Reject installations with >3% wrinkled area or unsealed seams.

  • Performance Testing:

    • Conduct 24hr inflow tests (design capacity: ≥5L/min per linear meter).

  • Documentation:

    • Submit mill test reports (ASTM D4716), as-built drawings, and pressure test records.


Title"Tunnel Drainage Systems: Best Practices for Drainage Board Implementation"

Key Metrics:
✔ Flow Efficiency – Maintains 85-90% of theoretical drainage capacity
✔ Construction Speed – 200-300m²/day installation rate
✔ Durability – Withstands 100+ kPa hydrostatic pressure

Critical Details:
▸ Anchoring: Stainless steel fasteners @ 0.5m grid (sidewalls) / 1m grid (invert)
▸ Transition Zones: Reinforce with composite drainage mats at T-junctions

Applications:

  • Road/rail tunnels

  • Underground stations

  • Mining adits

CONTACT US

COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD

Contact:Nickle Nie

Tel:008615866038408

Phone:008615866038408

Email:nickle@rhgeos.com

Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA