Material Inspection:
Verify drainage board specifications (thickness, permeability ≥10⁻² cm/s) and check for physical damage.
Tool Preparation:
Prepare specialized laying equipment, cutting tools, and anchoring materials (e.g., HDPE fixing pins).
Subgrade Treatment:
Achieve surface flatness (≤3mm/m² deviation) and remove protrusions (>2mm height).
Positioning & Layout:
Install along tunnel sidewalls and invert with 0.5-1% gradient toward collection points.
Maintain ≤5mm/m longitudinal wrinkling tolerance.
Connection Methods:
Overlap: Minimum 100mm overlap with seam sealing tape (peel strength ≥6N/cm).
Thermal Welding: For HDPE boards, use 180-220°C wedge welders at 0.8-1.2m/min speed.
Detail Processing:
At corners: Custom-cut boards with 150% increased fastener density.
At expansion joints: Allow 5-8% elongation capacity.
French Drain Interface:
Embed board ends 300mm into drain trenches with bentonite waterstop.
Pipe Connections:
Install geotextile-wrapped intake headers (orifice size ≤5mm) at 15-20m intervals.
Protective Measures:
Cover with 400g/m² nonwoven geotextile before subsequent construction.
Prohibit equipment (>2kPa ground pressure) directly over boards.
Backfill Protocol:
Use well-graded aggregates (4-20mm) in 200mm compacted lifts (≥95% Proctor).
Visual Inspection:
Reject installations with >3% wrinkled area or unsealed seams.
Performance Testing:
Conduct 24hr inflow tests (design capacity: ≥5L/min per linear meter).
Documentation:
Submit mill test reports (ASTM D4716), as-built drawings, and pressure test records.
Title: "Tunnel Drainage Systems: Best Practices for Drainage Board Implementation"
Key Metrics:
✔ Flow Efficiency – Maintains 85-90% of theoretical drainage capacity
✔ Construction Speed – 200-300m²/day installation rate
✔ Durability – Withstands 100+ kPa hydrostatic pressure
Critical Details:
▸ Anchoring: Stainless steel fasteners @ 0.5m grid (sidewalls) / 1m grid (invert)
▸ Transition Zones: Reinforce with composite drainage mats at T-junctions
Applications:
Road/rail tunnels
Underground stations
Mining adits
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA