Geocell Reinforcement Technology for Mountain Road Construction: Standardized Installation Procedures and Quality Control Measures

Technical Implementation Guide

  1. Pre-Construction Preparation

  • Material Verification: Inspection of HDPE geocell specifications (ASTM D7864 compliance) including:

    • Tensile strength ≥25kN/m

    • Seam peel strength ≥50N/cm

    • Cell height tolerance ±5%

  • Site Preparation:

    • Subgrade compaction to 95% Proctor density

    • Slope gradient adjustment to design specifications (typically 1:1.5 to 1:2)

  1. Geocell Deployment Protocol

  • Installation Parameters:

    • Machine-assisted unrolling along road centerline

    • Node-to-node anchoring with galvanized steel pins (500mm spacing)

    • Overlap splicing (200mm minimum) with thermal fusion bonding

  • Slope Adaptation:

    • Contour-following deployment technique

    • Crest-to-toe installation sequence

  1. Infill Placement & Compaction

  • Material Specifications:

    • Graded aggregate (20-40mm) with ≤10% fines

    • Maximum particle size ≤2/3 cell height

  • Construction Methodology:

    • Layered placement (300mm lifts)

    • Vibration compaction (4-6 passes at 2-4km/h)

    • 98% relative compaction requirement

  1. Slope Stabilization System

  • Surface Treatment:

    • Hydraulic seeding with erosion control matting

    • Bioengineering solutions for ecological integration

  • Drainage Integration:

    • Subsurface French drain installation

    • Surface water diversion channels

Quality Assurance Framework

  1. Material Compliance Testing

  • Cell wall thickness verification (≥1.2mm)

  • Polymer quality analysis (MFI 0.5-1.0g/10min)

  1. Construction Monitoring

  • Real-time compaction control (GPS-enabled rollers)

  • Anchorage pull-out testing (≥1.5kN resistance)

  1. Performance Validation

  • Load plate testing (EV2 ≥120MPa)

  • Slope stability analysis (FoS ≥1.5)

Engineering Benefits

  • 40% increase in bearing capacity versus unreinforced sections

  • 60% reduction in aggregate requirement

  • 25-year design life in alpine environments

(Note: This technical specification aligns with ISO 10318 and AASHTO M288 standards, providing quantifiable performance metrics for hillside road projects.)


CONTACT US

COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD

Contact:Nickle Nie

Tel:008615866038408

Phone:008615866038408

Email:nickle@rhgeos.com

Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA