WELCEOM TO TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD OFFICIAL WEBSITE
Language: 中文版 ∷  英文版

Company new

Principles of Slope Stabilization Using 3D Vegetation Nets

Technical Principles

  1. Vegetation Erosion Control

    • Canopy Layer: Plant foliage intercepts rainfall, preventing direct soil impact.

    • Litter Layer: Organic debris forms a protective barrier against surface erosion.

    • Root Reinforcement: Root systems mechanically stabilize soil through anchoring and tensile reinforcement.

  2. 3D Net Enhancement

    • Mechanical Stabilization: The net structure provides immediate slope protection within its thickness range.

    • Root-Net Composite: Plant roots interlock with net fibers, creating a reinforced "plate" structure that resists tension, shear, and shallow slope failures.

Construction Workflow

1. Slope Preparation

  • Clear loose rocks/debris; round sharp edges (radius ≥15 cm).

  • Achieve surface evenness: average undulation ±15 cm (max ±30 cm).

2. Drainage System Installation

  • Construct intercept/drainage ditches at:

    • Slope crest (to divert upland runoff)

    • Toe (collect seepage)

    • Benches (if present)

  • Slope-face drains: Added if water flow volume necessitates.

3. Net Deployment & Fixing

  • Unroll 3D nets top-down; embed top edge into crest ditch.

  • Overlap adjacent nets ≥10 cm; secure with U-shaped soft-iron pins (spacing: 1 pin/m²).

4. Soil Spraying

  • Growth Medium: Blend humus, compost, peat, hydrogels, and binders.

  • Apply ≥5 cm thickness, level with net protrusions.

5. Hydroseeding

  • Mix seeds with:

    • Mulch fibers

    • Binders/hydrogels

    • Fertilizers (compound + slow-release)

    • Microbial inoculants

  • Spray uniformly via hydraulic seeder.

6. Blanketing

  • Cover with 14 g/m² nonwoven fabric (bamboo-pin fixed). Remove when seedlings reach ~3 cm.

7. Maintenance

  • Watering: Maintain soil moisture for germination.

  • Nutrition: Fertilize based on plant growth stages.

  • Pest/Disease Control: Monitor and treat as needed.


Key Technical Parameters

ProcessSpecification
Net Overlap≥10 cm
Growth Medium≥5 cm depth
Slope Evenness±15 cm (avg), ±30 cm (max)
Blanket Weight14 g/m²

Conclusion: This integrated approach combines bioengineering (vegetation) and geosynthetics (3D nets) to create durable, ecologically sustainable slope protection.

3D Vegetation Net Slope Stabilization: Synergizing Nature and Engineering for Erosion Control.


CONTACT US

COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD

Contact:Nickle Nie

Tel:008615866038408

Phone:008615866038408

Email:nickle@rhgeos.com

Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA