Material Inspection: Verify drainage board specifications (size, type, quality) and check for damage/deformation. Prepare geotextiles and other auxiliary materials.
Tool Preparation: Equip specialized laying tools, scissors, welding machines (if needed), and measuring tapes.
Site Clearing: Remove debris, sharp objects, and standing water; ensure a level and compact subgrade.
Layout Marking: Mark installation lines per design, aligning board direction with slope gradient for optimal drainage.
Laying Methods:
Overlap (≥100mm): Ensure tight seams to prevent leaks.
Welding: Use professional equipment for airtight, durable seams.
Anchoring: Secure boards on steep slopes with anchor pins at calculated intervals to prevent displacement.
Coverage: Lay geotextiles smoothly over drainage boards to filter debris and protect drainage channels.
Seaming:
Sewing (≥50mm width): Use UV-resistant threads.
Overlap (≥200mm): Weight or fix edges to resist wind/water forces.
Visual Checks: Identify board/geotextile issues (tears, wrinkles, gaps) and rectify promptly.
Drainage Test: Conduct simulated rainfall or water flow tests to verify unobstructed drainage and compliance with design.
Formal Acceptance: Submit self-inspection reports to supervisors; proceed only after approval.
Title: "Step-by-Step Installation and Quality Control of Capillary Drainage Systems"
Key Requirements:
✔ Precision Alignment – Follow slope-driven layout plans.
✔ Seam Integrity – Overlap/weld to prevent leakage.
✔ Dual-Layer Protection – Geotextile safeguards drainage channels.
✔ Performance Validation – Testing pre- and post-construction.
Applications: Landscaping, foundation drainage, roof gardens, and retaining walls.
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA