Parameter Requirements:
Cell height: 10-30cm (based on slope angle)
Sheet thickness: 1.0-2.5mm
Tensile strength: ≥20kN/m (ASTM D6637)
Quality Control:
Verify UV stabilization (≥70% strength retention after 2000 hrs)
Check welding seam strength (≥80% parent material)
Surface Treatment:
Remove all debris >50mm
Achieve ≤30mm/m surface irregularity
Drainage Systems:
Install intercept drains (@ 20-30m spacing) with 1-2% gradient
Laying Procedure:
Unroll from crest downward with <2% deviation
Maintain 5-8% prestress during deployment
Connection Standards:
Use HDPE connectors (@ 300-500mm spacing)
Achieve ≥500N connection strength
Fixation Requirements:
Rebar anchors: Φ12-16mm @ 1.0-1.5m grid
Embedment depth: ≥0.8m for 2:1 slopes
Material Properties:
Maximum particle size: ≤1/3 cell height
CBR value: ≥8%
Compaction Protocol:
150-200mm lifts
90-95% Proctor density
Hydroseeding Mix:
50-80g/m² seed rate
3:1:1 (grass:legume:shrub) species ratio
Initial Maintenance:
20-30L/m²/week irrigation for 60 days
Inspection Frequency:
Daily during geocell deployment
Weekly for vegetation growth
Instrumentation:
Install inclinometers (@ 50m intervals)
Conduct DCP tests for compaction verification
Post-Construction:
30-day traffic prohibition
Warning signs @ 100m spacing
Title: "Geocell Slope Stabilization: Comprehensive Construction Methodology and Quality Control"
Technical Specifications:
▸ Design Life: 25+ years (buried conditions)
▸ Slope Angle Range: 1:1 to 1:3 (V:H)
▸ Construction Rate: 300-500m²/day
Performance Metrics:
✔ Erosion Control: <0.5kg/m²/year sediment loss
✔ Vegetation Coverage: ≥80% within 120 days
✔ Cost Efficiency: $25-40/m² installed
Standards Compliance:
ISO 13426: Geocell connection strength
ASTM D4439: Geosynthetic installation guidelines
EN 14475: Reinforced fill construction
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA