WELCEOM TO TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD OFFICIAL WEBSITE
Language: 中文版 ∷  英文版

Company new

Geomembrane Pond Liners: Technical Specifications and Implementation Guidelines

Material Advantages

1. Hydraulic Performance

  • Seepage Control:

    • Permeability coefficient: <10⁻¹² cm/s (ASTM D5887)

    • Reduces water loss by 90-95% vs. compacted clay

2. Chemical Resistance

  • pH Tolerance2-12

    • Withstands 10,000mg/L salinity (marine aquaculture applications)

3. Mechanical Properties

  • Tensile Strength25-40MPa (MD/TD)

  • Puncture Resistance≥500N (ASTM D4833)

4. Installation Efficiency

  • Deployment Rate500-800m²/day with trained crew

  • Adaptability: Accommodates complex geometries with <3% material waste

Technical Limitations

1. Vulnerability Factors

  • UV Degradation:

    • Requires protective cover within 14 days of exposure

    • 50% strength loss after 2000 hrs (unprotected)

2. Construction Requirements

  • Seam Integrity:

    • Dual-track welds must achieve ≥80% parent material strength

    • 100% spark testing at 15-25kV

Installation Protocol

1. Subgrade Preparation

  • Surface Standards:

    • Remove all particles >6mm

    • Achieve ≤25mm/m flatness

  • Cushion Layer:

    • Install 300g/m² geotextile over rocky substrates

2. Laying Procedure

  • Unrolling Technique:

    • Maintain 1-2% slack for thermal contraction

    • Use sandbags for temporary anchorage

3. Seaming Methods

TechniqueParametersQuality Control
Hot Wedge300-350°C @ 1.5m/minVacuum test @ 25kPa
Extrusion400-450°CPeel test ≥6N/mm

4. Detail Engineering

  • Corners: Install 1.5x reinforcement patches

  • Perimeter: 0.8m anchor trench with 10:1 slope

Maintenance Framework

1. Inspection Regimen

  • Frequency:

    • Monthly visual checks

    • Annual leak detection survey (electrical method)

  • Critical Areas:

    • Water level fluctuation zones

    • Wildlife access points

2. Repair Methodology

  • Patch Installation:

    • Minimum 150mm overlap

    • 24hr curing period

3. Lifecycle Management

  • Preventive Measures:

    • Maintain 300mm water cover during freezing conditions

    • Limit organic load to<50mg/L BOD


Title"Geomembrane Applications in Pond Construction: Performance Optimization and Maintenance Strategies"

Cost-Benefit Analysis:
▸ Material Cost: $3-8/m² (1.0-1.5mm HDPE)
▸ Service Life: 20-30 years (buried) / 10-15 years (exposed)
▸ ROI: 2-4 years for aquaculture operations

Standards Compliance:
✔ NSF/ANSI 61 - Potable water contact
✔ GRI GM13 - HDPE geomembrane specification
✔ EN 13361 - Hydraulic structure applications

Emerging Technologies:
◉ Smart Liners: Embedded sensors for real-time integrity monitoring
◉ Self-Healing Polymers: Microcapsule-based repair systems

CONTACT US

COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD

Contact:Nickle Nie

Tel:008615866038408

Phone:008615866038408

Email:nickle@rhgeos.com

Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA