Site Clearing
Remove vegetation/obstacles with minimal ground disturbance
Maintain natural soil structure (avoid over-compaction)
Material Inspection
Cell size: 400×400mm (typical for soft soils)
Sheet thickness: ≥1.2mm
Verify geocell specifications:
Prepare 600mm extended-length ground anchors
Survey Layout
Establish control points with RTK GPS (±20mm accuracy)
Laying Method:
Unroll parallel to traffic direction
Maintain 2-3% prestress tension
Surface Adaptation:
Allow 50-100mm vertical conformity to terrain
Fixation Parameters:
Rebar stakes: Φ12mm @ 1.0m grid
Embedment depth: ≥0.6m in saturated soils
Material Selection:
Graded aggregate (5-20mm) for base layer
Maximum particle size: ≤1/3 cell height
Compaction Protocol:
150mm lifts with vibratory plate compactor
Target density: 92-95% Standard Proctor
Junction Details:
Use ≥3 polymer connectors per lineal meter
Overlap seams with 200mm minimum extension
Equipment Restrictions:
Ground pressure: <20kPa for tracked vehicles
Avoid rut formation >50mm depth
Work Window:
Precipitation >10mm/24hr
Soil moisture content >LL+10%
Prohibit operations when:
Real-time Monitoring:
Laser scanning for surface evenness (<30mm deviation)
Nuclear density tests for infill compaction
Frequency:
Weekly for first month
Monthly thereafter
Focus Areas:
Anchor integrity
Infill retention
Access Control:
Install temporary fencing with 2m setback
Erosion Control:
Apply coconut fiber mats on exposed edges
Revegetation Protocol:
Hydroseed with 80g/m² native grass mix
Initial irrigation: 15L/m²/day for 30 days
Title: "Geocell Stabilization of Waterlogged Soils: Engineering Protocols and Performance Verification"
Technical Specifications:
▸ Design Load Capacity: 50-150kPa (dependent on infill)
▸ Construction Rate: 200-400m²/day
▸ Service Life: 15-20 years in saturated conditions
Cost Analysis:
Material + Installation: $18-35/m²
Lifecycle Savings: 40% vs. stone column methods
Standards Compliance:
✔ ASTM D8265 - Geocell soft ground applications
✔ ISO 13426 - Connection strength testing
✔ BS 8006 - Reinforced soil structure design
COMPANY:TAI'AN CITY RUIHENG BUILDING MATERIALS CO., LTD
Contact:Nickle Nie
Tel:008615866038408
Phone:008615866038408
Email:nickle@rhgeos.com
Add:NO.3566 LONGQUAN ROAD,TAI'AN HI-TECH ZONE,SHANDONG PROVINCE,CHINA